A two-layer dynamic scheduling method for minimizing the earliness and tardiness of a reentrant production line
Impact Factor:4.577
Affiliation of Author(s):Southeast University
Journal:International Journal of Production Research
Funded by:National Natural Science Foundation of China under grant 60974096
Key Words:re-entrant line; earliness/tardiness; two-layer dynamic scheduling; PI scheduling policy; fuzzy PI s
Abstract:This study focuses on the dynamic scheduling problem of a re-entrant production line, in which all of the parts
are assumed to have the same processing routes and be processed on every machine. A two-layer dynamic
scheduling method is proposed for the dynamic scheduling of the re-entrant line with the objective of
minimising total earliness and tardiness. This method consists of two layers. The top layer is to select the
appropriate scheduling policy, and the bottom layer is to generate the scheduling by using the policy selected
in the top layer. In the top layer, three different rules are co
All the Authors:Zheng Wang
First Author:Ying Yan
Indexed by:Journal paper
Discipline:Engineering
First-Level Discipline:Control Science and Engineering
Document Type:J
Volume:50
Issue:2
Page Number:499-515
ISSN No.:0020-7543
Translation or Not:no
Date of Publication:2012-05-07
Included Journals:SCI
Publication links:http://dx.doi.org/10.1080/00207543.2010.543171
Attachments:
A two-layer dynamic scheduling method for minimizing the earliness and tardiness of a reentrant production line.pdf Download []Times